Installation Guideline

Installation Guideline

1 – Wire/Cable Basic of Installation
• Wire/cable types and their applications
• National Electric Code (NEC)
• Structural basics (e.g., drilling studs)
• Basic installation techniques (e.g., opening sizes and device/component
placements, etc.)
• Basic wire dress (e.g., final trim lengths, labeling, etc.)
• Safety practices and procedures (including ongoing job site maintenance and
cleanliness
• practices and procedures
• Diagrams, documentation and instructions.

2 - Wire/Cable Preparation
• Wire/cable preparation techniques
• Wire/cable/connector tools and their use

3 - Connector Identification
• Connector types and their uses

4 - Connector Installation
• Connector installation techniques
• Connector pinout standards

5 - Install and Mount Devices

6 - Install Components

7 - Verify Operations

The best images by High Delifinition camera




All Kinds of Camreas
















The General contractor, Architects, Engineers (electrical) and

The General contractor, Architects, Engineers (electrical) and
Electrical contractor I worked with

General Contractor
--The PCL family of companies
--Ledcor Group of Companies
--Norson Construction Ltd
--Prism Construction
--Centcom Construction Ltd
--Scott Construction Group


Architects, Engineers (electrical)
--Stantec
--HEWIIT . KWASNICKY Architects Inc
--Hywel Jones architect
--Cohos Evamy
--DGBK Architects
--Ian Annand Architect Ltd
--K Paul Architect Inc
--CEI Architecture

--Acuman Engineering
--Falcon Engineering
--Jarvis Engineering Consultants Ltd
--Nemetz (S/A) & Associates

Electrical contractor
--Harbourview electric
--Western Pacific Enterprises
--Status Electrical Corporation
--Can-Tec Electrical services ltd
--Bert’s Electric
--Colwin Electrical Group

Supplier of Electrical Equipment, Low-Voltage, Electronics

Supplier of Electrical Equipment, Low-Voltage, Electronics
And Computer products

--Gescan
--Torbram Electric
--Nedco electrical supply

--ADI-Burtek
--Tri-Ed
--Anixter
--Tevelec

--Supercom
--Ingram Micro
--Tech Data
--NCIX

--MRO Electronic Supply Ltd
--RP Electronic Components Ltd
--Active Tech

My Qualification & Skills


Qualification & Skills

--Good education background and more years of experience in engineering installation.
--Security workers License by the ministry of public Safety and Solicitor General
--Registered with BC gaming Policy and Enforcement Branch
--Petroleum oriented safety training
--Level A CPR, Emergency First Aid and WHMIS certification
--Lift equipment operation program
--Fall orientation training
--Passing Fingerprint and Criminal Record Check
--Valid BC Class 5 driver’s license

My project- AB Scale Model


My project- Central Ph


My project- starlight casino





























My project- Bulky Valley,Smithers




My project-1875 Drommon Rd ,Vnacouver


My project-China Rice


Safety and Housekeeping

Safety and Housekeeping

--Jobsite risk assessment
--Accident prevention
--Emergency response
--Tool box meeting
--Personal Protective equipment
--Hazardous material guildelines
--Safe work practices

Camera test chart







My project- Best Buy at Langley




My project-Villa Casino



































DVR picture







































































TW2864 4-Channel Video Decoder and Audio Codec


SAA7130HL PCI video broadcast decoder


Advanced Technology of digital video

Mesh wireless
Video Analytics

Applications and solutions of digital video

Applications and solutions
-- Mobil video surveillance (police, first emergency responder, bus)
-- ATM monitoring
-- City wide video surveillance
-- BC Hydro monitoring
-- TELUS, Rogers monitoring
-- Construction site video surveillance
-- Live video surveillance on a cell phone
-- Major event portable video surveillance equipment
-- Video surveillance inside skytrain

System Integration

System Integration
--Alarm triggle,alarm verification,alarm recording
--Access control
--Fire alarm
--GIS
--Face recognition
--License plate recognition

System design of Video surveillance

System design (Autocad or visio)
--Site information checklist,
--System diagram
--Point to Point Wire diagram
--Equipment Layout
--Floor plan or Device Layout (Height, mount, the type of cable and View of Angle
--Camera schedule
--Spec & description
--Bill of material

4. CAD and Document Support

--System Overview
--System Specification
--Legend
--Equipment Lists
--Block Diagrams
--Riser Diagrams
--Floor plans
--Installation Plan
--Project Plan & Schedule
--Training Plans & Curriculum
--Equipment & Door Layouts
--Wiring Diagrams
--Subsystem Integration
--Data Sheets
--System Manuals

Design consideration of high definition camera

High definition camera
--CCD or CMOS Image sensors
--Progress Scan
--DSP/FPGA
--linux
--ARM processor
--test (resolution,color reproduction,lighting change)

Design considerations of IP video surveillance system

Digital video recorder
--PC –Based
Hardware compression card,with DSP,
Capture card with A/D converter,
Mpeg 4 Codec or H.264 Codec

--Embedded (DSP/FPGA,linux . ARM 9 RISC processor, DSPDM647/648 digital signal processor

--Hybrid DVR

-- IP Video Management Platform ,e.g.Verint/Indigvision

-- Test (Video Compression, Testing and Evaluation

DVR Block Diagram


Twelve Homeland Security functional areas

Twelve Homeland Security functional areas:
1. Border Security
2. Cargo Security
3. Chemical/Biological Defense
4. Cyber Security
5. Transportation Security
6. Counter-IED
7. Incident Management
8. Information Sharing
9. Infrastructure Protection
10. Interoperability
11. Maritime Security
12. People Screening

Productive

productivity
collaboration
business insight
flexibility

Project Management 2

show guys location and simple requirement.
try not to be interfering our customer’s work.
try not to be interfering other trade’ work.
try not to damage the wall,the floor when we move ladder or against the wall and cabinet( put cardboard on it when stand on it and put tools and materials on it.)

packing stuff, clean up carboard,cable .

accept job assignment and update, report manager

Daily Materials

  1. Playwood
  2. BNC connector
  3. B-connector
  4. Self-tap screw
  5. Bush
  6. Easy-archor
  7. DB-9
  8. RS232
  9. Electrical box
  10. Ball liner
  11. Contact
  12. MELM

My Equipments and Hand Tools


--Greenlee Textron Inc
--Fluke Electronics
--Ideal Industries,inc
--Klein Tools
--Dewalt
--Dremel
--Stanley Works
--Hilti Power Tools
--Allright Ladders




Securtiy Project Management 1

Pre-Project Phase (Sales)
- Performs and reviews estimates of security projects. The tasks include conducting site surveys and approving labor hours and materials.

Defining Phase

- Reviews sales proposals for accuracy and compliance with “customer” requirements.
D2- Reviews contract documents for general and specific terms and conditions.
D3- Reviews and confirms the project’s technical requirements.
D4- Prepares a “rough” Riser Diagram.
D5- Reviews the project’s bill of material and labor estimates.
D6- Conduct a site survey – kick-off meeting.
D7- Files necessary legal documents

Planning Phase:
P1- Prepares the project installation plan.
P2- Prepare submittal packages.
P3- Prepares the project Riser Diagram.
P4- Prepares the project preliminary schedule.
P5- Prepares a project re-estimate.
P6- Plans and schedules engineering, installation and subcontracting activities.
P7- Develops contingency plans for anticipated problems and deficiencies.

Implementing Phase:
I1- Maintains project plans and specifications.
I2- Maintains daily logbook and project binders.
I3- Performs material procurement (scheduling).
I4- Documents change orders.
I5- Supervises shop work and materials staging.
I6- Maintains and updates construction schedule, documentation and preparation.
I7- Manages the performance of subcontractors.
I8- Maintains all records of project status, project changes, material flow and other control records.
I9- Attends construction meetings.
I10- Conducts weekly progress meetings.
I11- Responds to and generates RFI’s and correspondence letters.
I12- Prepares project progress reports.
I13- Implements safety procedures.
I14- Implements quality assurance program to continuously improve customer satisfaction.
I15- Monitors project status and controls project costs.
I16- Review project costing reports.

Closing Phase:
C1- Prepares and submits as-built documents.
C2- Performs final billing.
C3- Completes project closeout form on time.
C4- Conducts punch list job walks.
C5- Conducts project turn over to the service department.
C6- Initiates the warranty period with the customer.
C7- Files proper legal documents .